The first step in this project was to remove all the old rigs from the property’s 6 chimneys safely. To do this we fitted temporary rigs to the scaffold whilst roof repairs were being completed then installed a communal system once the roof repairs were complete.
To compliment the style of the building, brown cabling was used at the front to match the sandstone with black used at the rear. We installed a power socket and separate earth cable as per CAI recommendations – everything was tested and commissioned. The customer commented on the neatness of the install and the way it complimented the existing structure and architecture.
Does your block of flats deserve better TV?, contact KD Comms a call today for a no obligation quote.